PLANNING TO DIG?

See also our General Restrictions and our Engineering Restrictions.

Accidents most often occur when excavation equipment operators are unaware of the presence of underground lines. Sunoco Pipeline participates in a damage prevention notification program called One Call, which provides a convenient toll-free telephone number for homeowners and construction crews planning to excavate near a pipeline.

Notifying One Call before digging helps ensure that any lines at the dig site are located before the work begins. One Call notification is required by law in many states. Taking the time to call before you dig, may reduce disruption of service, accidents, injuries, and possible delay of your project.

So if you are "planning to dig," contact the One Call Center in your state.

GENERAL RESTRICTIONS

  1. Any proposed plans must be submitted to Sunoco Pipeline's Right-of-Way and Engineering Departments for review to determine to what extent, if any, the pipeline or right-of-way will be affected by the proposed construction and/or development.
  2. A driveway or roadway may cross the right-of-way and pipeline perpendicularly but at no time will it be parallel to, over, and within the right-of-way.
  3. Buildings, trees, shrubs or any obstruction of a permanent nature shall not be constructed, planted or placed closer than 25 feet (25') to any existing pipeline (50' easement).
  4. Wells, leach beds, cesspools or sewer systems of any type shall not be placed within the right-of-way.
  5. All underground facilities crossing the right-of-way shall cross under the existing pipeline with a minimum of one-foot (1') clearance. This includes sewer drain lines.
  6. The earth cover over the pipelines shall be maintained and never changed in any manner without the express permission of Sunoco Pipeline.
  7. Any parking area placed over the pipeline by permission of Sunoco Pipeline shall be subject to an amended agreement entered into by subject parties prior to construction of same.
  8. If heavy equipment is to cross the existing pipeline for any reason, it will be necessary for owner to provide a ramp of sufficient material to protect said pipeline. Sunoco Pipeline will make the decision as to how much fill will be required for ramp. Upon completion of construction and discontinuation of heavy equipment passage over pipeline, ramp may be removed.
  9. A Sunoco Pipeline inspector must be present at the time that any work is done within Sunoco Pipeline's right-of-way.
  10. No blasting is permitted within 300 feet (300') of the pipeline. Anything less than 300 feet (300') must have the approval of and instruction from Sunoco Pipeline's Engineering Department.
  11. Should you have any questions or need additional information on the aforementioned Paragraphs 1 though 10, please contact Sunoco Pipeline's Right-of-Way Department. Call collect if outside the designated area code.
  12. At least three days prior to any construction activity near the pipeline(s), please call the following numbers:
  13. State Center Contact Number
    Michigan Michigan One Call System 800-482-7171
    New Jersey New Jersey One Call System 800-272-1000
    New Mexico New Mexico One Call System 800-321-ALERT(2537)
    New York Dig Safely New York 800-962-7962
    Ohio Ohio Utility Protection Service 800-362-2764
    Oklahoma Call Okie 800-522-6543
    Pennsylvania Pennsylvania One Call System 800-242-1776
    Texas Texas One Call System 800-245-4545

  14. To arrange to have the pipeline staked for location, please call the office below that is indicated. Call collect if outside the designated area code.
  15. Contact Contact
    ALTOONA, PA
    814-947-8300
    INKSTER, MI
    313-292-8850
    AKRON, OH
    330-374-0670
    MONTELLO, PA
    877-795-7271
    BIG FLATS, NY
    607-562-7203
    TOLEDO, OH
    419-691-4554
    FORT MIFFLIN, PA
    215-365-6501
    TRENTON, NJ
    609-586-1522
    GREENSBURG, PA
    724-834-2450
    DRUMRIGHT, OK
    918-352-9442
    ENID, OK
    580-242-6614
    MAYSVILLE, OK
    800-252-1257
    LONGVIEW, TX
    903-297-1311
    SEMINOLE, OK
    405-382-2085
    NEDERLAND, TX
    409-727-2301
    SNYDER, TX
    325-573-2001
    SOUR LAKE, TX
    409-287-3528
       

If you are planning to dig, please make sure that you notify One Call first. For your convenience, Sunoco Logistics provides a list of One Call Centers in the states in which it operates.

© 2002 - 2008 Sunoco Logistics. All Rights Reserved.